Construction of pipelines and flowlines 2” dia to 24” dia, 408 km LTCS piping fabrication, erection and high pressure thick walled injection piping work, equipment installation, civil, structural work at Tengiz
Achievements
Created history by successfully and safely hydrotesting high pressure sour-gas injection line of 10" dia, 62 mm thick, 70 m Next Generation Gathering System (NGGS), at a pressure of 1,035 bar
Safety Milestone Award for working 8.5 million safe-man hours without a day away from work injury between Feb 1, 2004 to Dec 9, 2006