EPC and installation of 28" dia, 30 km pipeline, also known as the Hopping Island Project
10 km was laid in offshore in water depths up to 20 m and 7 kms in marchy and swampy area
Achievements
Involved two terminal stations on hilltops with over 500, 000 m3 of earthwork, having scrapper receivers, scrapper launchers, gas metering skids
Extremely undulating seabed terrain, with majority of the section beig hard rock. Dredging quantum was close to 300, 000 m3, which was achieved by deploying three cutter suction dredgers, one backhoe dredger and one rock dredger
Two crossings each 550 m long by Horizontal Directional Drilling method
Achieved 1.89 million safe man-hours
Achieved quickest golden tie in of the onshore and offshore sections within a record 3 hours
Successfully completed the project in a record 12 months time period