Detailed engineering, laying of (40” dia) 205 km oil pipeline and (32” dia) 183 km gas pipeline from South Myanmar to chainage 205 km including 5.56 km offshore portion in both pipelines and supply of material (except line pipe and major free issue material).
Gas pipeline commissioned in July 2013.
Oil pipeline commissioned in January 2015.